Winter decoration and construction articles
Wood articles: seal oil treatment, prevent wind split # winter decoration Note #
Do not open storage material procurement, construction site after material brought into a layer of edible vegetable oil to brush on the surface, also known as seal oil treatment to wind cracking and deformation. Decorative panels shipped to the site, a dry towel to wipe dust, continuous brushing twice varnishes back, and all decorative panels should be flat, decorative panels in the bottom cushion a blockboard, then press a panel above Zhang Blockboard, so you can make the sheet remains flat. Never put the panel vertically, will lead the panel cracking, warped.
Putty articles: Window time, amplitude with stress
Walls, ceilings or wallpaper if the putty to dry naturally, do not open the doors and windows, to prevent rapid water loss and the impact of construction and deformation. Ventilation window of time also pay attention to: the best selection in between 10:00 to 16:00, this time a relatively higher temperature, can prevent new scraping putty freeze. Putty correct way is: such as the first pass of putty is completely dry, putty Zaigua second time; the second pass putty completely dry before carefully polished with sandpaper. Sand plaster, wall insulation paste all the best cloth, putty directly on the cloth, dry with sandpaper until smooth. If there is a large hole in the wall or recessed, plus the best complement to reconcile with gypsum powder latex flat wall. When the walls have large cracks, the crack to paste kraft paper and then putty, larger affixed cloth is best, then putty, which can prevent wall formation, no cracking – artificial wooden outdoor decking cost.
Paint papers: the most important environmental temperature
Stencilled painter in a variety of coatings, should be strictly in accordance with the temperature of the product description applied. Under normal circumstances, the paint is applied ambient temperature should not be lower than 5 ℃; wherein the coating is applied is commonly used in blending ambient temperature should be above 0 ℃, when the ambient temperature is not lower than the varnish applied 8 ℃. Oilers live but also to pay attention to "warm", fully dry before the open doors and windows for ventilation.
Accessories articles: mortar do not contain ice, cement do not open air
Sand used in construction should be carefully screened and may not contain ice. While stirring mortar, the water temperature must not exceed 80 ℃. If the decoration of cement required, it is best not to have to pay attention to insulation in outdoor construction site – price 2x6x13 engineered Wood clear.
Warm winter decoration articles
When basic decoration, it is necessary to proceed, "holding", there are some specific practices, such as: When laying wooden flooring, insulation materials can be placed, such as mineral wool board, fire-retardant foam, etc. between the grille under the floor. When a custom door manufacturer may be required to fill glass wool or mineral wool insulation materials and other fire safety. Installation of doors and windows should be sealed, if the original windows are single ordinary window glass, it is best to replace the insulating glass bridge metal window decoration. Who lives in the top floor of the households, but also in the insulation material in place when the ceiling gypsum board to improve thermal insulation. If the original walls have inner insulation, be careful not to destroy in the decoration. If the design is the balcony with the room open, it is necessary in the balcony wall, the top surface of the installation of insulation – wood powder composite materials.